Sulky VISION 2 DPB Instrukcja Użytkownika Strona 49

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 51
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 48
49
I
nformations
E
Information
Informationen
GB
Problems - Solutions
Problems
Solutions
The unit does not switch on Check - unit/power supply connections
- power cable fuses
Calibration test Check - calibration factor
- shutters are closed
Repeat the stationary test.
Shutters open to maximum then to minimum Check - Tractor forward speed coefficient
- spreading width
(24.00 - note the position of the decimal point)
The unit switches on but the actuators do not move Check - Fuses
The area meter reading is incorrect Check - connection / machine
- working width
- forward speed
Flow rate Check - programmed flow rate
- fertiliser coefficient
- PTO speed = 540 rpm
- spreading width
- tractor’s forward speed
- shutter opening/closing performance
- actuator travel
- tramlining
The forward speed rate is incorrect Check - connection on unit
- sensor magnet clearance
- magnet rotation
- sensor wire continuity
(resistance 100 ± 10)
- 100-m coefficient
The tonnage counter reading is incorrect Check - connection / machine
- working width
- forward speed
- fertiliser coefficient
- shutter opening/closing
Przeglądanie stron 48
1 2 ... 44 45 46 47 48 49 50 51

Komentarze do niniejszej Instrukcji

Brak uwag