Sulky VISION 2 DPB Instrukcja Użytkownika Strona 83

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 85
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 82
83
GB
Informations / Information / Informationen
Problems/Solutions
E
1
4
83
PROBLEMS SOLUTIONS
The control unit does not switch on Check - unit/power supply connections
- power supply cable fuses
Flow rate test Check - calibration factor
- that the shutters are open
Repeat the test.
Shutters open to maximum then to minimum Check - tractor forward speed coefficient
- spreading width
(24.00 note the position)
The unit switches on but the rams do not move Check - fuses
- the battery power supply
The area counter reading is incorrect Check - connection / machine
- working width
- drive rate
Flow rate Check - programmed flow rate
- fertiliser coefficient
- spreading width
- tractor forward speed
- ram travel
- tramlining
The forward speed is incorrect Check - connection on unit
- distance between the detection ring / sensor
- that the detection ring is rotating correctly
- sensor wire continuity
- 100-m coefficient
The tonnage counter reading is incorrect Check - connection / machine
- working width
- drive rate
- fertiliser coefficient
- shutter opening/closing
Przeglądanie stron 82
1 2 ... 78 79 80 81 82 83 84 85

Komentarze do niniejszej Instrukcji

Brak uwag