
Troubleshooting
FAULT SOLUTIONS
The unit will not switch on Check - unit / power cable connections
- power cable fuses
The forward speed is not correct Check - connection on unit
- magnet / sensor distance
- correct rotation of the magnet
- sensor wire continuity (resistance 100 ± 10)
- 100m coecient
Tonnage counter reading incorrect Check - connection / machine
- working width
- forward speed
- fertiliser coecient
- shutter opening and closing
Calibration test Check - calibration factor (T)
Repeat the test in static mode
Shutters open to maximum then to minimum Check - tractor forward speed coecient.
- spreading width (24.00 beware of the decimal point)
The unit switches on correctly, but the actuators do
not move
Check - the fuses
Area counter reading incorrect Check - connection / machine
- working width
- forward speed
Flow rate Check - programmed ow rate
- fertiliser coecient
- PTO speed 540 rpm
- spreading width
- tractor forward speed
- shutter opening/closing
- actuator travel
- tramlining
GB
E
133
4
Informations
Komentarze do niniejszej Instrukcji